Department of Power

Average rating
(State-Acts)
Sr. No.
Name of Acts
Name of rules
1
The Goa , Daman and Diu Electricity Duty Act, 1986(7 of 1986) (Amended up to 2012)
The Goa, Daman and Diu Electricity Duty Rules, 1987.
2
The Goa Prohibition of Further Payments and Recovery of Rebate Benefits)Act 2002 (8 of 2002)
Section 7 empower to the Government to make Rules. However rules not found.
3

The Goa Public Lighting Duty Act, 2021. 

(25 of 2021)

The Goa Public Lighting Duty Rules, 2021.
(Central Acts)

 

Sr. No.
Name of the Central Act in which Rules/ Notifications  are framed/ issued
Name of the Rules
1
Energy Conservation Act, 2001( Act No.52 of 2001)
Section 57 empower to State Government to make rules
2
Electricity Act 2003 (Central Act 36 of 2003)
1. Standards of Performance Regulations, 2009;

2. Treatment of Other Businesses of Transmission Licensees and Distribution Licensees Regulations, 2009

3.State Advisory Committee Regulations, 2009

4. Terms and Conditions for Determination of Tariff) Regulations, 2009

5. Appointment of Consultants Regulations, 2009

6. Open Access in Transmission and Distribution Regulations, 2009

7. Electricity Trading Regulations, 2010.

8. State Grid Code Regulations, 2010.

9. Electricity Supply Code Regulations, 2010

10. Procurement of Renewable Energy Regulations, 2010

11. Connectivity and open Access in Intra-State Transmission and Distribution Regulations, 2017.

12. Electricity (Rights of Consumers) Rules, 2020.

 

Services Notified under the Goa (Right of Citizens to Time-bound Delivery of Public Services) Act, 2013 (Goa Act 19 of 2013)
Department of Power
Sr. No.
Name of the Service
Designated Officer
Time Schedule
Appellate Officer
1
Rectification of fuse blown out or MCB tripped
Junior Engineer of concerned Section
Within four working hours for Urban areas from receipt of complaint
Executive Engineer.
Junior Engineer of concerned Section
Within eight working hours for Rural areas from receipt of complaint
2
Rectification of broken service line/service line snapped from the pole
Junior Engineer of concerned Section
Within six working hours for Urban areas from receipt of complaint
Executive Engineer.
Junior Engineer of concerned Section
Within twelve working hours for Rural areas from receipt of complaint
3
Rectification of fault in distribution line/ system
Junior Engineer of concerned Section
1. Temporary supply to be restored within 4 working hours from alternate source, wherever feasible. 2. Rectification of fault and thereafter restoration of normal power supply within twelve working hours.
Executive Engineer.
4
Repair/ replacement of mistake of Distribution of transformer/burnt
Assistant Engineer of concerned Sub-Division
(1) Temporary restoration of supply through mobile transformer or another backup source within eight working hours, wherever feasible.
 (2) Normal power supply within twenty four working hours in urban areas, within forty eight working hours in rural areas.
Superintending Engineer.
5
Restoration of HT mains failed
Assistant Engineer of concerned Sub-Division
(1) Temporary restoration of power supply within four working hours, wherever feasible.
(2) Rectification of fault within twelve working hours.
Superintending Engineer.
6
Rectification of supply problem in grid (33 KV or 66 KV) sub-station.
Assistant Engineer of concerned Sub-Division
(1) Restoration of supply from alternate source, within six working hours, wherever feasible. (2) Repair and restoration of supply within forty eight working hours.
Superintending Engineer.
7
Rectification of Power Transformer Failure
Assistant Engineer of concerned Sub-Division
Restoration of supply from alternate source within six working hours, wherever feasible
Superintending Engineer.
8
Rectification of voltage variation problem
Junior Engineer
Within four working hours
Executive Engineer.
9
Tapping of Transformer
Junior Engineer
Within three days
Executive Engineer.
10
Installation & Up-gradation of HT/ LT system
Executive Engineer
One hundred and eighty days
Superintending Engineer.
11
Rectification of complaint lodged for burnt meter
Junior Engineer of the concerned Section
Restore supply within six working hours and new meter shall be provided within three days from the receipt of complaint
Executive Engineer.
12
Change of consumer’s name due to change in ownership/occupancy for property
Assistant Engineer (Com) of concerned Sub- Division
Urban area-Sixty days Rural area-One hundred and twenty days
Superintending Engineer.
13
Transfer of consumer’s name to legal heir
Assistant Engineer (Com)
Fifteen days
Superintending Engineer.
14
Change of category
Assistant Engineer (Com) of concerned Sub- Division
Ten days
Superintending Engineer.
15
Shifting of meter/service line etc.
Assistant Engineer of concerned Sub-Division
Thirty days
Superintending Engineer.
16
Resolving of complaints on billing
Assistant Engineer (Com) of concerned Sub- Division
Fifteen days
Superintending Engineer.
17
Request for Reconnection L.T Consumer
Assistant Engineer (Com)
Within two days of payment of past dues and reconnection charges
Superintending Engineer.
18
Request for Reconnection H.T .Consumer
Assistant Engineer (Com)
Within two days of payment of past dues and reconnection charges
Superintending Engineer.
19
Providing up to date bill to Consumer on request
L.T .Consumer – Assistant Engineer (Com)
Seven days
Superintending Engineer.
20
Providing up to date bill to Consumer on request
H.T. Consumer – Executive Engineer of concerned Division
Seven days
Superintending Engineer.
Electricity Department
1
Temporary / Permanent Service Connection for Domestic, Commercial, Agriculture.
Assistant Engineer.
Fifteen days.
Superintending Engineer. 
 
2
Temporary / Permanent Service Connection for Industries. 
 
 Submission of proposal for load approval.
Executive Engineer.
Ten days.
Superintending Engineer. 
Decision on Load approval.
Chief Electrical Engineer.
Ten days.
Secretary (Power).
Approval of Estimates.
Executive Engineer. / Superintending Engineer / Chief Electrical Engineer.
Ten days.
 
 
 
 
Superintending Engineer. 
Releasing of connection after execution of work
Executive Engineer.
Ten days.
Superintending Engineer. 
3
Meter
Testing
 
 
 
Removing of Meter and sending to MRT laboratory.
Assistant
Engineer.
Five days.
Superintending Engineer. 
Testing of the Meter
Assistant Engineer-MRT.
Five days.
Superintending Engineer.
Re- installing a meter.
Assistant Engineer.
Five days.
 
Superintending Engineer.
4
Shifting of Electric poles.
 
Submission of the proposal to the Superintending Engineer for approval after inspection is done.
Executive Engineer.
Ten days.
Chief Electrical Engineer.
 
Decision on the submitted proposal.
Superintending Engineer. 
 
Five days.
Conveying of intimation to deposit supervision charges.
Executive Engineer.
Three days.
 
Submission of proposal to the Superintending Engineer for approval after inspection is done.
Executive Engineer.
Ten days.
 Chief Electrical Engineer.
Penalty and Compensation in case of Delay, Denial or Deficiency in Service
Default
Amount
Person
Failure  in providing public Service
Rs.50/- each day or Rs.2500/- whichever is less
Designated Officer
Delay in providing public Service
Rs.50/- each day or Rs.2500/- whichever is less
Designated Officer
Deficiency in public service provided
Rs.500/-
Designated Officer
Non-Compliance of Order
Not less than Rs.1000/- maximum Rs.5000/-
Designated Officer
Failed to decide Appeal with in time limit
Not less than Rs.1000/- maximum Rs.5000/-
Appellate Authority
Compensation  maximum-  60% of Penalty imposed   under Section 14
 

Company Goal

“To make available the latest law on tip of finger”

 

service_standard

 

Disclaimer

Every effort has been made to avoid any mistake or omission. This publication is on the condition and understanding that neither the publisher, the Editors or the composer would be liable in any manner to any person by reason of any mistake

Read more..

Contact Us

Narayani Publications

H.No.469/1, Doxirwaddo,
Assagao – Bardez Goa .
403-507
Telephone : 91 832 2268101
Mobile : 9921363943
Email: npublications.goa@gmail.com

Send a message